VUL Ludwig PFS flags €1.7B NPV8 and 20% IRR for lithium project
VUL’s Phase two (Ludwig) PFS shows a €1.7B NPV8 and 20% IRR, plus 15% lower CapEx. Ludwig targets integrated, low-cost lithium carbonate production with a 30-year life and improved capital efficiency.