Surge Announces Positive Pre-Feasibility Study at Nevada North Lithium Project
Surge Battery Metals Inc. announced a positive Pre-Feasibility Study for its Nevada North Lithium Project, reporting an after-tax NPV8% of US$9.81 billion, an after-tax IRR of 23.6%, and an operating cost of US$4,719/tonne lithium carbonate. The study indicates a faster 4.2-year payback over a 42-year mine life, improv