Sun Peak drills copper, zinc and silver at Safra VMS project
Sun Peak drilled 39.0 metres grading 1.38% copper and 0.84% zinc, plus 19.42 metres of 1.17% copper, 2.59% zinc and 22.35 g/t silver.
Find public news by keyword, exact ticker, category and date.
Open a ticker page for its news coverage. The news search below stays a text search.
1 result loaded, newest first. End of these results. The latest changes are still being indexed. Try again shortly for updated results.
Sun Peak drilled 39.0 metres grading 1.38% copper and 0.84% zinc, plus 19.42 metres of 1.17% copper, 2.59% zinc and 22.35 g/t silver.