Mithril drills wide, confirms 550m strike at Copalquin-Zaragoza target
Mithril reports its first systematic drilling in the Copalquin-Zaragoza structure at Target 4, with wide, high-grade intercepts confirming a 550m strike.
Find public news by keyword, exact ticker, category and date.
Open a ticker page for its news coverage. The news search below stays a text search.
1 result loaded, newest first. End of these results.
Mithril reports its first systematic drilling in the Copalquin-Zaragoza structure at Target 4, with wide, high-grade intercepts confirming a 550m strike.