Gold X2 reports extension intersection at Span prospect
Gold X2 Mining says phase one drilling at the Span Prospect intersected 40.4m grading 2.05 g/t Au from 343.6m, indicating a potential NE extension of the Moss Deposit.
Find public news by keyword, exact ticker, category and date.
Open a ticker page for its news coverage. The news search below stays a text search.
1 result loaded, newest first. End of these results. The latest changes are still being indexed. Try again shortly for updated results.
Gold X2 Mining says phase one drilling at the Span Prospect intersected 40.4m grading 2.05 g/t Au from 343.6m, indicating a potential NE extension of the Moss Deposit.