El Paso issues strained operating condition notice for pipeline locations
EPNG said linepack started Sept. 28 at 7,682 MMcf, down 69 MMcf from Sept. 27. It said specific locations were drafting the system and that Washington Ranch is available for withdrawal, while IHSW Service will be suspended.