Blossom Gold intercepts 44.8 m at 1.22 g/t Au at Rosebud heap — leach project in Nevada
Blossom Gold reported new drill results from its Rosebud open-pit heap-leach project in Nevada, extending near-surface mineralization. East Zone hole BG26-042 cut 106.8 m at 0.42 g/t gold from 74.8 m, including 24.2 m at 0.72 g/t. South Zone hole BG26-031 returned 44.8 m at 1.22 g/t gold from 149.8 m, including 3.2 m a