SQUAWK/NEWS
Account
Theme
Account
Menu
Live News EARNINGS FLASH L impact

Redeia says Red Eléctrica does not drive power system cost overruns, cites grid security role

Redeia rejected claims it drives up power-system costs, framing grid interventions as mandated measures to secure supply at lowest cost. It said technical constraints have risen since 2021 alongside Spain’s power-system transition, not operator discretion. September constraint-up energy cleared at EUR 293.44/MWh versus EUR 143.25/MWh in the day-ahead market, driven by generator offers. Jan. 1-Sept. 30, technical-constraint resolution and secondary regulation lifted generators’ revenue by EUR 3.91 billion. September “reinforced operation” cost EUR 8.8 million, equivalent to EUR 0.02/day for a typical PVPC household. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Redeia Corporación SA published the original content used to generate this news brief on October 13, 2026, and is solely responsible for the information contained therein. (C)

REDE.MC