Press Release: Rock Tech Lithium Announces Total Capital Costs of Approximately CAD$600 Million for Red Rock Converter based on Preliminary DFS Results
Preliminary results of the Definitive Feasibility Study ("Preliminary DFS Results") for the Red Rock converter in Ontario indicate total capital costs of approximately CAD$600 million. -- Preliminary DFS Results are based on a further optimized, industry-proven converter design with an annual production capacity of a