Japan Gold Acquires Two Rigs for 12,000–16,000m Drill Program
The rigs are en route to Japan for deployment at the Bajo Project. The planned drilling campaign is expected to continue through mid-2027.
Japan Gold acquired two diamond core drill rigs, now en route to Japan for deployment at the Bajo Project. A planned 12,000—16,000m drilling campaign is expected to continue through mid-2027; no prior-period comparison was provided.Material DetailsContext by AI AnalystThis is an operational update…