Goliath Drills 13.45 g/t AuEq Over 4.85 Meters at Surebet
Goliath reports drill hole GD-26-478 intersected 13.45 g/t AuEq over 4.85 meters at the Surebet discovery. Assays are pending for 40 holes drilled in 2026.
Goliath reports drill hole GD-26-478 intersected 13.45 g/t AuEq over 4.85 meters at the Surebet discovery. Assays are pending for 40 holes drilled in 2026.