ExxonMobil Starts Production at Uaru, Raising Guyana Capacity to 1.1 Million b/d
The fifth FPSO in the Stabroek Block, Errea Wittu, begins production with capacity of 250,000 barrels per day.
The fifth FPSO in the Stabroek Block, Errea Wittu, begins production with capacity of 250,000 barrels per day.