Capita plc (CPI) Faces Up To £24M Draft Cost Disallowance
Ofgem has opened a consultation on a draft determination provisionally proposing to disallow up to £24M of Smart DCC costs for 2025/2026, versus a draft disallowance of £31M for 2024/2025. A final determination is expected in Q1 2027.Material DetailsContext by AI AnalystThis is a recurring regulato…
Ofgem has opened a consultation on a draft determination provisionally proposing to disallow up to £24M of Smart DCC costs for 2025/2026, versus a draft disallowance of £31M for 2024/2025. A final determination is expected in Q1 2027.Material DetailsContext by AI AnalystThis is a recurring regulato…