Great Pacific Gold Completes 16 Drill Holes and Begins Elamaraka Drilling
Great Pacific Gold completed 16 holes totaling approximately 3,600 m at Magiabe and Mengmut, with assays pending. Maiden drilling began at Elamaraka; prior channel sampling returned 9.0 m grading 4.81 g/t gold, including 1.0 m at 26.86 g/t.