Awarded tank design order by Hudong-Zhonghua Shipbuilding for 3 LNG carriers; No financial terms disclosed
Order is for Bonny Gas Transport, Nigeria LNG's shipping arm. - Will design cryogenic tanks for three vessels, each with 174,000 m3 capacity, fitted with the NO96 Super+ membrane containment system. - Vessel delivery expected between Q2 and Q3 2029.
Order is for Bonny Gas Transport, Nigeria LNG's shipping arm. - Will design cryogenic tanks for three vessels, each with 174,000 m3 capacity, fitted with the NO96 Super+ membrane containment system. - Vessel delivery expected between Q2 and Q3 2029.