SQUAWK/NEWS
Account
Theme
Account
Menu
Live News REGULATION FLASH L impact

Consolidated Water Subsidiary PERC Water Wins $39.8 Million Pismo Beach Water Purification Contract

Consolidated Water subsidiary PERC Water won an approximately $39.8 million design-build contract for California's Central Coast Blue water purification facility. The City of Pismo Beach project will have annual production capacity of approximately 750 acre-feet. Construction is expected to begin in spring 2027, with the overall design-build project taking approximately 24 months. The facility aims to provide a drought-resistant local water supply and protect the groundwater basin from seawater intrusion. Disclaimer: This news brief was created by Public Technologies (PUBT) using generative artificial intelligence. While PUBT strives to provide accurate and timely information, this AI-generated content is for informational purposes only and should not be interpreted as financial, investment, or legal advice. Consolidated Water Co. Ltd. published the original content used to generate this news brief via EDGAR, the Electronic Data Gathering, Analysis, and Retrieval system operated by the U.S. Securities and Exchange Commission (Ref. ID: 0001104659-26-116231), on October 15, 2026, and is solely responsible for the information contained therein. (C)

CWCO.O