Doubleview Reports First 2026 Hat Project Drill Assays
The first reported results from the company's 2026 drilling campaign include hole H109, which returned 541.2 metres of 0.27% CuEq; holes H113–H114 add south-west extension data.
The first reported results from the company's 2026 drilling campaign include hole H109, which returned 541.2 metres of 0.27% CuEq; holes H113–H114 add south-west extension data.