TABLE — North Sea gas maintenance schedule: Adds Atwick outage
Oct 13 (Reuters) — The following is a schedule of maintenance work on gas infrastructure, mainly in the North Sea. The table is arranged by outage start date. Volumes are in standard million cubic metres per day (mcm/d) or gigawatt-hours per day (GWh/d) unless otherwise indicated. OPERATOR LOCATION OUTAGE DATES OUTAGE DESCRIPTION/IMPACT 2021 Outages Fluxys Interconnector Jul 6, 0600 CET — Mar 31, 2028 0600 CET UK import capacity reduction to 31,392,673 kWh/h; unplanned equipment maintenance 2025 Outages INEOS FPS system 4Q (25 November) Train 3 TAR has commenced with a current forecast duration of twelve (12) weeks 2026 Outages SSE Aldbrough Aug 28, 0600 BST — Nov 15, 0600 BST 70.01 GWh/d; unplanned injection unavailability Centrica UK Rough Sep 02, 0500 BST — Oct 23, 0500 BST 11.8 mcm/d; planned injection unavailability Gassco Nyhamna Sep 28, 0600 CET — Oct 24, 0600 CET 19.8 mcm/d; yearly maintenance SSE # Atwick Sep 29, 2131 BST — Oct 26, 1800 BST 15 GWh/d; unplanned injection unavailability BBL company BBL pipeline Sep 30, 0600 CET — Oct 15, 0600 CET Planned maintenance TAQA # UGS Bergermeer Oct 03, 0500 CET — Oct 27, 0500 CET 403 GWh/d; other unavailability TAQA UGS Bergermeer