NATGAS PIPELINE CRITICAL NOTICE: Sabine Pipe Line maintenance / operational alert / other / scheduling alert
( This is the verbatim text of a critical notification provided by the pipeline operator to its shippers. The information has not been independently verified. This item may be followed by a news story depending on the severity of the incident's impact, if any, on operations. ) Company Name: Sabine Pipe Line Notice Type Description:Maintenance / Operational Alert / Other / Scheduling Alert Posted Date:Oct 12, 202608:41:05 AM Effective Date:Oct 15, 202609:00:00 AM End Date:Oct 21, 202609:00:00 AM Posting Text: SABINE PIPE LINE LLC CRITICAL NOTICE OF PLANNED MAINTENANCE Sabine will be performing system maintenance during the following windows: • October 15th —20th Normal operations will resume October 21, 2026 at 9:00 am. The following locations will be taken to 0 flow: Location: Loc #: • KM Texas — High 463541 • Trunkline Holmwood 482116 • Westlake Petrochem 123547 • LGS Targa 463543 • Citgo 287442 • Enlink — Calcasieu 294215 • KMLA — Holmwood 879896 • Tejas — High 287775 • GTP 111605 Operational pipeline receipt capacity will be restricted to a total volume of 85,000 Dth/d from the following mainline receipt points for deliveries to Henry Hub (IHT): • HPL — High Pressure
( This is the verbatim text of a critical notification provided by the pipeline operator to its shippers. The information has not been independently verified. This item may be followed by a news story depending on the severity of the incident's impact, if any, on operations.
) Company Name: Sabine Pipe Line Notice Type Description:Maintenance / Operational Alert / Other / Scheduling Alert Posted Date:Oct 12, 202608:41:05 AM Effective Date:Oct 15, 202609:00:00 AM End Date:Oct 21, 202609:00:00 AM Posting Text: SABINE PIPE LINE LLC CRITICAL NOTICE OF PLANNED MAINTENANCE Sabine will be performing system maintenance during the following windows: • October 15th —20th Normal operations will resume October 21, 2026 at 9:00 am.
The following locations will be taken to 0 flow: Location: Loc #: • KM Texas — High 463541 • Trunkline Holmwood 482116 • Westlake Petrochem 123547 • LGS Targa 463543 • Citgo 287442 • Enlink — Calcasieu 294215 • KMLA — Holmwood 879896 • Tejas — High 287775 • GTP 111605 Operational pipeline receipt capacity will be restricted to a total volume of 85,000 Dth/d from the following mainline receipt points for deliveries to Henry Hub (IHT): • HPL — High Pressure 693157 • Centana — Jefferson 23757 Sabine anticipates an impact to Firm Transportation services during the maintenance window noted. 6. 2. Any updates to this maintenance will be posted as they become available.
com for further information. More information is available at