Osisko Metals Reports Strong Copper Intersection in Gaspé Drill Program
Osisko Metals announced analytical results from its 2026 drill program at Gaspé, intersecting 94 meters averaging 1.47% copper. The results also include a high-grade interval of 5.3 meters averaging 8.31% copper and 51.0 g/t silver.
0 g/t Ag. The release was dated Oct. 07, 2026.