Arctic Minerals reports best DP1 drill intersection at Hennes Bay: 64.4 m at 1.3% CuEq
Arctic Minerals said its DP1 program at the Hennes Bay copper-silver project returned a top intercept of 64.4 m at 1.3% CuEq from the Henneviken prospect, including 1.7 m at 3.18% CuEq. DP1 drilled 12 holes totaling 4,187 m outside the current resource estimate; an updated resource estimate is underway with two assays pending.