Dakota Gold selects single heap-leach facility, 0.5-inch crush size for Richmond Hill PFS
Modeled ultimate gold recovery averaged 80.4% at 0.5-inch crush size versus 75.9% at 1 inch. Final assays for the PFS resource update covered 42,791 metres of 2025-2026 drilling across 333 holes.