NATGAS PIPELINE CRITICAL NOTICE: El Paso Updated September 2026 Maintenance
Notice Type Description: MAINTENANCE Posted Date: 9/19/2026 Effective Date: 09/19/2026 End Date: 09/20/2026 Posting Text: EPNG Maintenance Calendar September 2026 Seg Area Seg Nbr Flow Dir Location Base Capacity (MDth) Tue 1 Wed 2 Thu 3 Fri 4 Sat 5 Sun 6 Mon 7 Tue 8 Wed 9 Thu 10 Fri 11 Sat 12 Sun 13 Mon 14 Tue 15 Wed 16 Thu 17 Fri 18 Sat 19 Sun 20 Mon 21 Tue 22 Wed 23 Thu 24 Fri 25 Sat 26 Sun 27 Mon 28 Tue 29 Wed 30 Anadarko 690 F PLAIN ST 756 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 % Seg Avail 756 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% Anadarko 715 B PLAINS N 312 112 112 112 112 112 112 112 112 112 112 112 112 112 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 % Seg Avail 312 64% 64% 64% 64% 64% 64% 64% 64% 64% 64% 64% 64% 64% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% Anadarko 740 B AMAR N 292 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 33 % Seg Avail 292 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 89% 8
This is a real-time flash headline. A verified provider body is not available, so SquawkNews does not present it as a full article.