NATGAS PIPELINE CRITICAL NOTICE: El Paso Preliminary October 2026 Maintenance
Notice Type Description: MAINTENANCE Posted Date: 9/18/2026 Effective Date: 09/18/2026 End Date: 09/19/2026 Posting Text: EPNG Maintenance Calendar October 2026 Seg Area Seg Nbr Flow Dir Location Base Capacity (MDth) Thu 1 Fri 2 Sat 3 Sun 4 Mon 5 Tue 6 Wed 7 Thu 8 Fri 9 Sat 10 Sun 11 Mon 12 Tue 13 Wed 14 Thu 15 Fri 16 Sat 17 Sun 18 Mon 19 Tue 20 Wed 21 Thu 22 Fri 23 Sat 24 Sun 25 Mon 26 Tue 27 Wed 28 Thu 29 Fri 30 Sat 31 Anadarko 685 314430 (INN30PLA) 750 750 750 750 750 % Seg Avail 750 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 100% 100% 100% 100% 100% 100% 100% Anadarko 690 F PLAIN ST 756 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 405 756 756 756 756 405 405 405 405 405 405 405 405 % Seg Avail 756 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 46% 0% 0% 0% 0% 46% 46% 46% 46% 46% 46% 46% 46% Anadarko 692 300109 (INN26PLA) 189 189 189 189 189 % Seg Avail 189 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 100% 0% 0% 0% 0% 100% 100% 100% 100% 100% 100% 100% 100% Anadarko 715 B PLAINS N 312 312 312 312 312 % Seg Avail 312
This is a real-time flash headline. A verified provider body is not available, so SquawkNews does not present it as a full article.