Galaxy Digital data centers get conditional ERCOT Batch Zero classifications
Five Texas data center projects received conditional ERCOT Batch Zero classifications. Together they cover ~4.2 GW gross power capacity, with 1.63 GW base load and 2.6 GW studied load.
This is a real-time flash headline. A verified provider body is not available, so SquawkNews does not present it as a full article.