Soluna Finishes Kati 1; secures conditional ERCOT base-load for 166 MW
Soluna Finishes Kati 1 and secured a conditional base-load position for all 166 MW in ERCOT.
This is a real-time flash headline. A verified provider body is not available, so SquawkNews does not present it as a full article.