Nava to shut 60 MW Odisha power unit for up to 60 days
Hyderabad-based Nava Ltd said it will temporarily shut down a 60 MW IPP unit in Odisha from September 6, 2026, for routine inspection, maintenance and overhauling. The shutdown is expected to last about 55 to 60 days.
This is a real-time flash headline. A verified provider body is not available, so SquawkNews does not present it as a full article.