Sterling Metals reports drill results at MEPS Discovery, including 1.70% CuEq
Drill hole SC-26-16 at MEPS Discovery intersected 451 metres at 0.30% CuEq from top of bedrock, including 101 metres at 0.50% CuEq and 12 metres at 1.70% CuEq.
This is a real-time flash headline. A verified provider body is not available, so SquawkNews does not present it as a full article.